Awaab’s Law Phase 2 (30 November 2026): What Contractors Need to Know
Awaab’s Law extends to fire, electrical, falls and excess cold on 30 November 2026. What it means for contractors working for social landlords, plus a 5-step checklist for the records landlords now need.
Workfloow Team
· Workfloow Journal

If you carry out repairs or maintenance for a housing association or council, the rules on how fast you need to act, and what you need to write down, are about to tighten again.
Awaab’s Law has applied to damp, mould and emergency hazards in social housing since 27 October 2025. On 30 November 2026 it expands. From that date, social landlords will face the same legal deadlines for a much wider list of hazards, including fire, electrical faults, falls, excess cold and excess heat.
The law puts the duty on the landlord, not on you. But a landlord can only hit those deadlines if their contractors do. So in practice, a lot of the pressure is about to land on the people who actually turn up and do the work.
Here’s what’s changing, where contractors tend to get caught out, and a few simple things you can put in place now.
What is Awaab’s Law? A quick recap of Phase 1
Awaab’s Law is named after Awaab Ishak, a two-year-old who died in 2020 after long exposure to mould in his family’s social housing flat in Rochdale. The rules that came in last October set fixed timescales for social landlords in England once they become aware of a potential hazard:
Emergency hazards: investigated and made safe within 24 hours.
Significant hazards: investigated within 10 working days.
Written summary to the tenant: within 3 working days of the investigation finishing.
Work to make the home safe: within 5 working days of the investigation.
Further preventative work: started within 5 working days where possible, and physically underway within 12 weeks at the latest.
If a home can’t be made safe in time, the landlord has to offer the tenant somewhere else to stay.
What changes in Awaab’s Law Phase 2 on 30 November 2026
The timescales stay the same. What changes is the list of hazards they apply to. According to the government’s Phase 2 guidance, it now includes:
excess cold and excess heat
falls, including on stairs and between levels
structural collapse and falling elements
fire and explosions
electrical hazards
domestic hygiene hazards
That pulls in far more trades than before. Heating engineers, electricians, roofers, general maintenance teams and anyone doing fire safety work in social housing will now be working against the same deadlines that damp and mould contractors have had for the past year.
When does the Awaab’s Law clock start for contractors?
The deadlines run from the moment the landlord becomes aware of a hazard. The government guidance tells landlords to take legal advice on whether their contractors count as their agents, because that affects when awareness starts.
In plain terms: if your engineer is fixing a dripping tap and spots black mould spreading behind the bath panel, or exposed wiring under the stairs, the landlord may be treated as knowing about it from that moment. Even if nobody tells the office until Friday.
That changes what doing the job properly means. It’s no longer enough to fix what you were sent for. Your team needs to notice other hazards, record them and report them the same day.
Awaab’s Law checklist for contractors: 5 things to put in place now
1. Make “any other hazards?” part of every visit
Add a short question at the end of every job sheet or checklist, whatever the original job was. Something like: “Did you see any damp, mould, electrical, fire or trip hazards anywhere in the property?” If the answer is yes, the engineer adds a photo and a short note before closing the job.
2. Photograph before you touch anything
Landlords now need to show what they found, when they found it and what was done. Timestamped photos taken on arrival, during the work and on completion are the simplest evidence there is. Photos sitting on an engineer’s personal phone don’t count for much if nobody can find them three months later.
3. Get findings back to the landlord the same day
If the landlord only has 3 working days to send the tenant a written summary, a report that arrives a week later is no use to them. Agree with each client how they want hazards reported, and make it a habit to send findings before the end of the working day.
4. Record the reason when something slips
The guidance accepts that some delays are genuinely out of anyone’s control, like a tenant not giving access or parts being unavailable. But the landlord needs a record of why. If your engineer was turned away at the door, write it down with the date and time. That note might be what protects your client, and your contract.
5. Keep the history with the property, not the person
When a hazard comes back, the first question will be what was done last time. If that answer lives in one engineer’s head or a WhatsApp group, you’ll struggle. Store every visit, photo and note against the address so anyone in your team can pull it up.
Why this is an opportunity for good contractors
Housing associations are reviewing their contractor lists ahead of 30 November. They’re looking for firms that respond quickly and hand over clear records without being chased.
If you can show a landlord a timestamped photo trail, a signed-off checklist and a written summary for every job, you become the easy choice. Firms still relying on paper job sheets and memory will find it harder to keep those contracts.
How Workfloow helps contractors keep Awaab’s Law records
Workfloow is job management software built for UK trade and field service teams, and the record keeping above is exactly what it’s designed for.
Checklists your team can’t skip. Add an “other hazards spotted?” step to every job type, with photo and note fields, so it gets asked on every visit.
Timestamped photos saved to the job. Engineers take photos in the app, and they’re stored against the job and the property, not on someone’s phone.
Live job status. The office can see when a job is booked, in progress and finished, which makes it much easier to keep an eye on deadlines.
Customer signatures on site, plus job records you can export as a PDF to share with the landlord.
Full history for every address, so the next engineer knows what was found and done last time.
To be clear, Workfloow doesn’t make anyone compliant on its own, and the legal duty sits with the landlord. What it does is make the evidence your clients need easy to capture and quick to hand over.
Plans start at £29 a month for up to 3 people, and you can try it free for 14 days with no card needed. See how it works for damp and mould contractors, electricians and property maintenance teams.
Awaab’s Law Phase 2: frequently asked questions
When does Awaab’s Law Phase 2 start?
30 November 2026. It extends the existing timescales to more hazards, including fire, electrical hazards, falls, excess cold and excess heat.
Does Awaab’s Law apply to contractors?
The legal duty sits with social landlords, not contractors. But landlords rely on contractors to meet the deadlines, and a contractor spotting a hazard may count as the landlord becoming aware of it.
Does Awaab’s Law apply to private landlords?
Not yet. It currently covers social housing in England. The government has consulted on extending it to the private rented sector.
What records should contractors keep?
When the job was reported and attended, what was found, timestamped photos, what work was done, any reasons for delay such as no access, and the customer’s sign-off.
What happens in Phase 3?
Phase 3 will cover the remaining hazards in the Housing Health and Safety Rating System, apart from overcrowding. No start date has been confirmed yet.
Sources
Related reading: Property maintenance software · Water damage documentation for insurance claims · Best field service management software UK